Self-introduction:
Professional Experience
Hyundai Heavy Industries, Seoul, Korea as Sr. Process EngineerDec’13 till date
Key Result Areas:
Leading a team of 3 Engineers for Process Engineering deliverables
Handled/Reviewed 3 rd party CFD study for Production separator
Working on PFD, DPDT, PSD & MSD and P&ID Development
Attending 3D model review and design review meetings
Reviewing & approving vendor document
Participating in HAZOP/SIL and completing recommendations
Liaised with Instrumentation, Mechanical, Piping, Electrical groups and other departments
Preparing design philosophies involving Isolation Philosophy, Drainage Philosophy, Relief & Blowdown
Philosophy, Shutdown Philosophy, Process Design Procedure, Process & Utility Description, Process Control &
Operating Philosophy
mputing line sizing, vessel sizing, control valve hydraulics, pump hydraulics and other processes
Conducting PSV relief load estimation and orifice sizing
Creating instrument datasheet for on/off valves, control valves, PSV, transmitters, gauges, cause & effect chart
and safety chart preparation
Attending alarm management workshop
Highlights:
Implemented VE inputs that helped in achieving cost saving
avoid additional PSVsrecommended by HAZOP session
Suggested ways to resolve process design issues in cost efficient manner
Imparted trainings to the team members on PSV relief load estimation, using Flare net and HTRI software for
process design, Lessons Learnt Sessions, etc.
Mentoring of Junior Engineers within the Process Team
Projects:
Moho Nord FPU Project, Congo, Africa – Area Lead for Gas Dehydration, TEG Regeneration , Water Injection &
Dead Oil Systems, Turbo Generator, Produced water treatment areas
NASR Project, Abu Dhabi – Area Lead for Gas Dehydration & Glycol Regeneration and Production Separator Areas
Samsung Engineering Company Ltd as Senior Engineer – ProcessOct’07-Nov’13
Oct’07-Feb’11: New Delhi, during which deputed to head office in Seoulfor 1 year
Mar’11-Nov’13: Seoul, Korea
Key Result Areas:
Tracked deliverables and calculations by assigned engineers
Worked on P&ID development and participated in 3D model review
Prepared Control & Alarm Narratives / Process Control Philosophy and Safeguarding Memorandum
Developed utility consumption calculation & summary
Created flare load summary / flare header sizing using Aspen Flarenet, hydraulics calculations for pumps &
compressors, 2 phase separator sizing
Monitored quality and developed checklist for equipment datasheets / P&ID & process calculations
Implemented feed verification activities such as preparation of Feed Verification Report, Feed Hazop/SIL
Recommendations Review & Incorporation, Technical Clarifications with Client, Technical Documentation and
Feed Calculations Verification
Projects:
At Seoul, Korea:
DepuLE for Offshore project Umm Lulu PKG 2 Feed verification and Proposal
Quality Control Consultant (QCC) for Iraq Badra Project, Bolivia Fertilizer Project
Sabah Oil & Gas Terminal Project, Kota Kinabalu, Malaysia
At New Delhi:
Detail Engineering of DHDS Unit, NOCL, India
Upgradation & Revamp of SKIKDA Refinery, Algeria- UTOS Unit (on deputation to Samsung Engineering,
Seoul)
Feed Proposal for UGCC-Ethylene Plant, Uzbekistan (on deputation to Samsung Engineering, Seoul)
L&T Chiyoda Ltd., Mumbai as Engineer – Process Aug’06 to Oct’07
Key Result Areas:
Developed:
o PFDs, P&IDs & UDDs and corresponding Line Lists
o Relief load calculations and relief valve sizing (As per API)